Skip to content
Marksism
Go back

When did MVP become minimum I can be bothered doing?

MVP

Minimum Viable Product. Build the smallest solution that solves a real need for the customer. Most people hear “minimum” and stop there.

If you’re building an MVP to send someone into space, the minimum viable product is still a rocket.

Yes, it might be a smaller rocket. You (hopefully) won’t put a person on the first flight. But you still have to figure out propulsion, trajectory, re-entry, and - if you’re SpaceX - how to land the thing again. None of that goes away because you prefixed it with “minimum.” The minimum is huge. MVP doesn’t mean run a simulation. It means build a rocket.

It isn’t the minimum you want to build. It’s the minimum that needs to be built to actually solve the customer’s problem.

When I first came across the term in 2014, the bar for viable was lower. Back then, a bit of roughness was ok, if it worked it was good enough - people didn’t expect as much. But now attention spans are shorter, the quality bar is higher, there’s more competition, and the technical hurdles to building a great product are being eroded every year. What was difficult a decade ago is easy now.

Some teams have tried rebranding the concept - “Minimum Loveable Product.” I don’t think it needs rebranding. MVP is fine. We just need to be clear on what viable actually means.

Viable needs two things. The first is: does it actually solve the problem? I mean really solve it, not a limp token gesture. The second is a little bit of magic: something that makes someone walk away with a smile on their face thinking it was better than expected. You want to know, if it fails, that it was the idea - not the execution. And you need the magic now, table stakes aren’t enough.

The M is a constraint. The V is the non-negotiable.


Share this post:

Previous Post
Beware of Goodhart's Law
Next Post
AI can't give you talent